Capabilities · Systems integration and test

Install, integrate and verify, to signed acceptance.

We install, integrate and verify satellite ground systems on site. We run your test procedures and lead acceptance with you.

One accountable partner between your engineers and the site.

  • Decades of team experience integrating and testing LEO and GEO ground systems
  • Field teams put together for your regions, with clearances and capacity confirmed when we scope your program
  • Our team has deployed 100+ ground station gateways and 600+ secure GEO satellite endpoints. Our experience
The gap

Integration and acceptance compete for your engineers' time. We give it back.

  1. Engineering time

    Every trip to a remote gateway takes an engineer off the roadmap. New regions mean more trips.

  2. Install is not acceptance

    An installed site still has to be integrated, tested end to end and read against your criteria before anyone can sign.

  3. Results need reading

    Running a procedure is the easy part. Someone on site has to know what each output should be and see when it isn't.

Until those tests are run and read properly, an installed site can't be accepted.

Client outcomeEngineering time goes back to your roadmap.
On site

From an empty site to signed acceptance

© 2026 Nexus GSN (Global Space Networks). All rights reserved. Signature NXGSN-WEB-2026-V23.5-SYSTEMS-INTEGRATION-TEST-ART02 NEXUS GSN · TELEPORT 0101010101010101 010101
  1. 01Install
  2. 02Integrate
  3. 03Verify
Working model

How we work with your engineers

Where we fit: bridging the gap between engineering and the field team

Your engineers

To usProcedures, expected results, defect fixes

Back to youResults, defects, feedback

Nexus GSN: install, integrate and verify, on site

Execute to the SI&T plan, run the test procedures and lead acceptance.

Our crew: Field engineers · RF/Optical · Network · Application test · Performance · Field quality

Mission operations

Transition to operations. Ready for daily operation.

Before, during and after each site

  1. Before the site

    Before anything is built, we do the homework. We go through your test procedures, scripts and expected outputs with your engineers, then rehearse them in the lab before anyone travels.

  2. On site

    We run your procedures as written, record every result, help trace where an issue starts, and lead acceptance with you. Your engineers join on a call when an output needs a second look.

  3. Back to your team

    Results, logs and steps to reproduce go into your defect system. We review results with you daily during integration and send weekly status.

For mature operators, we work inside your framework and tools.

Any configuration change on site goes through your change control.

Full-stack integration

From the RF chain to your application

Between them, the engineers on site can follow a fault from RF through to your application without handing it off.

  • RF and antenna

    G/T and EIRP, pointing and tracking, RF chain health, polarization and interference.

  • Optical terminals

    Alignment, acquisition and tracking, atmospheric link characterization and laser safety.

  • Network and timing

    Backhaul and routing, latency and jitter, path failover, GNSS timing and holdover.

  • Ground software

    We run your application's test procedures and scheduling checks, and compare outputs with expected results.

  • Mission performance

    Contact success, throughput, availability and recovery time, measured against your acceptance criteria.

  • Security when in scope

    Hardening checks and access control, tested against your framework when the project calls for it.

How we deliver

7 stages. 7 customer acceptance gates. Complete program control.

  1. Requirements

    Joint workshop with engineers, alongside factory acceptance.

    You get
    Verification matrix
    Gate
    Baseline agreed
  2. Test strategy

    Test procedure, test sequence and acceptance criteria.

    You get
    SI&T plan
    Gate
    Strategy approved
  3. Pre-ship

    Lab dry-run of site procedures.

    You get
    Rehearsed procedures
    Gate
    Dry-run complete
  4. Installation

    Civil, mounting, cabling, power-up.

    You get
    Install inspection report
    Gate
    Install passed
  5. Site integration

    Bring up and test every layer.

    You get
    Subsystem test records
    Gate
    Subsystems pass
  6. End-to-end test

    Performance and failover; security where in scope.

    You get
    End-to-end test report and defect log
    Gate
    No open criticals
  7. Acceptance

    SAT and handover.

    You get
    Acceptance package, with SOP
    Gate
    Acceptance signed
  8. Success gate

    You own the plan and the milestones; Nexus GSN delivers the outcome.

Client outcomeLower deployment risk, faster site activation, and an operationally ready system with documented acceptance.
Engagement models

Find the model that's right for you

Turnkey

We install, integrate and verify.

Best forNew networks and new regions, site by site.

Our crew installs to the SI&T plan, runs your test procedures and takes each site to signed acceptance, from the first site to the last.

Augment

Our specialists inside your team.

Best forOperators with a mature network and their own framework.

We add RF, network, application and performance engineers inside your framework and tools, at rollout peaks and as needed.

Team and skillsets: optimized on-site presence across every project phase

  • SI&T leadRuns the SI&T plan; leads acceptance to sign-off
  • Field engineersCivil, mounting, cabling, power-up to the SI&T plan
  • RF/Optical engineerVerifies pointing, tracking, RF chain or optical link
  • Network engineerBrings up backhaul, failover and GNSS timing
  • Application test engineerRuns your test procedures; checks expected results
  • Performance test engineerMeasures contact success, throughput, availability
  • Field quality inspectorChecks install quality, safety and as-built records
  • Cybersecurity test engineerChecks hardening and access control (if in scope)

Augment model: working side by side with your team. Clearance requirements and rollout capacity are confirmed when we scope the program.

Acceptance package

What you get for every site

One package per site, handed over at acceptance and signed by you.

  1. Verification matrix

    Pass or fail per requirement.

  2. Test records

    Subsystem test records and the end-to-end test report.

  3. Defect log

    Root cause and closure for each defect.

  4. As-built records

    Install drawings, inspection report and performance baselines.

  5. Runbooks and SOPs

    Handed to your operations team.

One format across your sites, or your template if you have one. Every requirement traced to a test record.

Next step

Start with your first sites

Bring the sites you plan to integrate first, and the procedures you'd want run on them.

  1. Workshop with your engineers. Your priorities, requirements and acceptance criteria.
  2. SI&T plan and proposal for the first sites, on the model that fits.
  3. Crew mobilized. Each site installed, integrated and taken to your signed acceptance.
Contact our team Tell us which sites come first, and we'll set up the workshop.